Considering switching shifts

I currently work in the building on the night shift, but am considering other shifts if I can. What’s the shift after night? 4-9am, right?? I’ve heard the word “preload,” but I’m not sure what that shift does (loading, I imagine). I’m small sort on light duty due to healing an injury. Do they sort during that shift??